Production process:
Raw material treatment→Mixing system→Extrusion system→Drying system→Cooling system→Packing system
Equipment configuration:
1) Mixer 2) Screw Conveyor 3) Extruder7) Packing Machine
Model |
Installed Power |
Power Consumption |
Output |
Size |
TSE65-S |
110 kw |
80 kw |
200-260 kg/hr |
18x1.3x2.2(m) |
TSE85-S |
176 kw |
140 kw |
300-500 kg/hr |
23x1.5x2.2(m) |
TSE90-S |
200 kw |
150 kw |
800-1200 kg/hr |
25x1.5x2.6 (m) |
Tel: 0086-531-89654200
Phone: 0086-18865912025
Site:http://www.chinashengrun.com/eng/
Address:No. 18, Area 3, Xiaoluzhuang Industrial Park, Tianqiao, Jinan, China